×

manpower scheduling meaning in Chinese

人力调配

Examples

  1. Develop a supportable piping project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
    制定管道项目计划,包括在工程设计,估算,设备和人力的规划,以及质量保障,启动和安装的委托方面的战略和实施的细节。
  2. Develop a supportable process project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
    制定工艺项目进程计划,包括在工程设计,估算,设备和人力的规划,以及质量保障,启动和安装的委托方面的战略和实施的细节。
  3. The fundamentals and basic flow of genetic algorithm are discussed in detail . associated with the production mode and characteristics of wall - paper industry , its production scheduling belongs to the hybrid flow shop ' s problem . applied based - on permutation coding genetic algorithm and used minimal production time as target function , it is solved the problem of low efficiency of wall - paper production equipments " utility that is caused by manpower scheduling and improved the production efficiency
    2 )对生产调度问题的研究现状和研究方法做了综述和整理,深入探讨了遗传算法的基本原理和基本流程,并结合墙纸行业的生产模式和生产特点,指出其属于混合flowshop问题,采用基于置换编码的遗传算法,并以最小生产时间作为目标函数,较好的解决了由人工调度带来的墙纸生产设备使用效率偏低的问题,提高了生产效率。

Related Words

  1. manpower planner
  2. manpower system
  3. maintenance manpower
  4. manpower capital
  5. manpower drain
  6. productive manpower
  7. manpower authorization
  8. manpower analysis
  9. unskilled manpower
  10. skilled manpower
  11. manpower resources; sources of troops
  12. manpower roller
  13. manpower service centre
  14. manpower shortage
PC Version

Copyright © 2018 WordTech Co.