manpower scheduling meaning in Chinese
人力调配
Examples
- Develop a supportable piping project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
制定管道项目计划,包括在工程设计,估算,设备和人力的规划,以及质量保障,启动和安装的委托方面的战略和实施的细节。 - Develop a supportable process project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning
制定工艺项目进程计划,包括在工程设计,估算,设备和人力的规划,以及质量保障,启动和安装的委托方面的战略和实施的细节。 - The fundamentals and basic flow of genetic algorithm are discussed in detail . associated with the production mode and characteristics of wall - paper industry , its production scheduling belongs to the hybrid flow shop ' s problem . applied based - on permutation coding genetic algorithm and used minimal production time as target function , it is solved the problem of low efficiency of wall - paper production equipments " utility that is caused by manpower scheduling and improved the production efficiency
2 )对生产调度问题的研究现状和研究方法做了综述和整理,深入探讨了遗传算法的基本原理和基本流程,并结合墙纸行业的生产模式和生产特点,指出其属于混合flowshop问题,采用基于置换编码的遗传算法,并以最小生产时间作为目标函数,较好的解决了由人工调度带来的墙纸生产设备使用效率偏低的问题,提高了生产效率。